WFC I – The North End
216 Ohio St, Weirton, WV 26062, USABasics
- Property Type: Land
- Category: Heavy Power, Mega-Site, Rail Served, River Served
- Status: Available, Divisible, Lease, Sale
- Area, sq ft: 2352240 sq ft
- Site Size, Ac: 54 acres
- Pad Sizes (Ac): 5 - 54+ Acres
- Expansion Size: 30 acres
- Zoning: Heavy Industrial
- Topography: Level
- Dimensions: 785 ft x 3400 ft
- Property Name: Weirton Frontier Crossings
- Date added: Added 4 months ago
Description
- Property Description: This 54-acre, parcel previously was used for staging raw materials needed for production of iron at the former Weirton Steel site. Some minor site grading is required to develop on this parcel, which Frontier Industrial Corp can perform within a short period of time. Grading plans have been completed to illustrate the development of large building pads across this footprint. There is immediate rail access to the Norfolk Southern main line and rail siding, as well as immediate access to WV State Route 2. There are multiple points of ingress/egress and a 3-mile industrial access road is planned to make industrial truck transportation more efficient for future site tenants. Port access is available on site ~0.1 miles away and the property is zoned for heavy industrial, manufacturing, or other industrial uses.
Transportation
- Commodity Handling: Aggregates, Steel, Supersacks, Lumber, Dimensional Loads, Palletized Loads, Dry Bulk, Liquid Bulk, Hazardous, Dry/Liquid Food Grade
- Rail Access: Yes
- Rail Provider: Norfolk Southern
- Rail Quantity (mi): 15,000 ft Total, 5,000 ft spur
- Rail Details: Multiple upgraded rail spurs with existing switches in place.
- Maritime Access: Yes
- Maritime Details: 60 mooring cells, 2 miles of riverfront ownership, 40,000 sq ft transloading pad, 15-ton crane served unloading dock, liquid barge unloading capability.
- Nearest Interstate: I-376 (15 miles)
- Nearest Highway: US-22 (1.5 miles)
- Nearest Airport: Pittsburgh International Airport (15 miles)
- Road Details: A 3 mile industrial access road is currently under construction, creating a new interconnection via bridge access to US-22, WV State Route 2, and Ohio State Route 7. Certified truck scale also available site.
Utilities
- Utilities: Electricity, Natural Gas, Raw Water, Potable Water, Public Sewer, Private Sewer, Fiber Optic, Industrial Gas
Electric
- Electric At Site: Yes - Distribution and Transmission
- Electric Providers: MonPower (Distribution), First Energy (Transmission)
- Transmission Substation at Site: Yes
- Electric Transmission Voltage(s): 138 kV
- Electrical Distribution Voltage(s): 13.8 kV
- Available Capacity (MW): 150 MW (138 kV), 5 MW (25 kV)
- Private Electric Substation at Site: No
- Electric Service Options: Conceptual load studies for 138 kV and 25 kV have been completed and have validated load availability. Detailed Load Study being submitted for 20 MW to reserve capacity on 138 kV circuit. Frontier can offer temporary or permanent power generation solutions from 2 MW - 50+ MW as needed. Service can be provided from this solution within 120 - 180 days. Service options are as follows: Option 1 - New 25 kV --> 13.8 kV Substation (5 MW), Option 2 - New 138 kV --> 13.8 kV Substation (150 MW), Option 3 - FGC CAT EAAS Generation (5 - 50 MW), Option 4 - 12.5 kV (3-phase) service for construction power (1 - 2 MW).
Natural Gas
- Natural Gas At Site: Yes - Distribution and Transmission
- Natural Gas Providers: Mountaineer Gas (Distribution LDC), TC Energy (Transmission)
- Natural Gas Line Size: 12" (Mountaineer Gas), 12" (TC Energy) - Both at site
- Available Natural Gas Capacity: 12" (2,000 MCF/hr) - From Greek Street Point of Delivery
- Natural Gas Pressure: 210 psig MAOP (12"), 175 psig operational
- Natural Gas Details: New dedicated natural gas point of delivery on site (Constructed 2023) to provide gas to industrial park tenants. This delivery point taps a 12" TC Energy transmission pipeline and is metered and delivered by Mountaineer Gas, the Local Distribution provider where Mountaineer Gas has a 12" steel pipeline for distribution. This 12" pipeline has over 2,000 MCF/hr capacity reserved and an operational pressure of 160 psig. Service laterals can be installed. Engineering and design for lateral extension complete along industrial access road currently under construction.
Water
- Public Water at Site: Yes - Potable
- Public Water Provider: City of Weirton
- Public Water Line Size (in): 12"
- Public Water Capacity: 4,600,000 GPD
- Private Water At Site: Yes
- Private Water Source: River
- Private Water Line Size: n/a
- Private Water Capacity: 100,000,000 GPD+
Wastewater
- Public Sewer At Site: Yes
- Public Sewer Provider: City of Weirton
- Public Sewer Line Size: 16", 24"
- Public Sewer Capacity: 4,400,000 GPD
- Private Sewer At Site: No
- Private Sewer Capacity: n/a
Fiber Optic and Communications
- Fiber Service to Site: Yes
- Fiber Type 1 Providers: Horizon, Comcast, At&t
- Fiber Type II Providers: Comcast, AT&T, Spectrum, Verizon, etc
- Data Speeds At Site: 20 GB/s Up and Down
Other Utilities
- Other Utilities: Yes
- Other Utilities(s): Nitrogen, Hydrogen, Oxygen
- Other Details: Messer Gas - Oxygen (16", 400 psig), Messer Gas - Nitrogen (12", 400 psig), Cleveland Cliffs - Hydrogen (2", 800,000 SCF/Day available, 96 psig)